Piping Design Engineering & Construction Starting Day, Date & Time - Friday, 15 June 2018, 10.00 am to 05.00 pm, Mode of Operation - Full Time, Duration - 4 Months           Piping Design Engineering & Construction, Starting Day, Date & Time -Friday, 20 July 2018, 10.00 am to 05.00 pm, Mode of Operation - Full Time, Duration - 4 Months           Piping Design Engineering & Construction Starting Day, Date & Time - Friday, 7 Sept 2018, 10.00 am to 05.00 pm, Mode of Operation - Full Time, Duration - 4 Months           Piping Design Engineering & Construction Starting Day, Date & Time - Sunday, 12 August July 2018, 10.00 am to 05.00 pm, Mode of Operation - Week End / Part Time(Sunday), Duration - 11 Months           Process Design & Simulation Starting Day, Date & Time - Saturday, 16 June 2018, 10.00 am to 05.00 pm, Mode of Operation - Full Time, Duration - 4 Months           Boiler & Plant Equipment Design & Engineering, Sunday Batch Starting Day, Sunday, 22 July 2018, 10.00 am to 05.00 pm, Mode of Operation - Week End / Part Time(Sunday), Duration - 8 Months           Process Design & Simulation Starting Day, Date & Time - 16 June 2018 Saturday, 10.00 am to 05.00 pm, Mode of Operation - Week End/Part Time (Saturday& Sunday), Duration - 6 Months           Boiler & Plant Equipment Design & Engineering, Sunday Batch Starting Day, Sunday, 22 July 2018, 10.00 am to 05.00 pm, Mode of Operation - Week End / Part Time(Sunday), Duration - 8 Months           Boiler & Plant Equipment Design & Engineering Starting Day, Date & Time - Sunday 22 July 2018 10.00 am to 05.00 pm, Mode of Operation - Full Time, Duration - 4 Months           Boiler & Plant Equipment Design & Engineering Thursday Batch Starting Day, Date & Time - Thursday, 23 August 2018, 10.00 am to 05.00 pm, Mode of Operation - Week End / Part Time(Thursday), Duration - 8 Months           Water & Waste Water Treatment. Week End Batch (only Sunday Batch) Starting Day, Date & Time - Sunday, 19 August 2018, 10.00 am to 05.00 pm, Mode of Operation - Week End / Part Time(Sunday), Duration - 8 Months           Food Processing & Packaging Technology Starting Day, Date & Time - Friday, 24 August 2018, 10.00 am to 05.00 pm, Mode of Operation - Full Time, Duration - 4 Months           

5th floor, A-Wing, Office No. 74-79, K.K. Market, Dhankawadi, Pune-411043. +91 9822086802 +91 9822093666
Boiler & Plant Equipment Design & Engineering

This course incorporates study of major international codes and standards such as ASME, API, TEMA and IBR.

Boiler & Plant Equipment Design & Engineering

Brief Outline:

This course incorporates study of major international codes and standards such as ASME, API, TEMA and IBR. This course is recommended for candidates aspiring to make their careers with Engineering Consultants, Fabrication Companies, EPC Contractors, and Project Engineering Companies, Process Engineering Courses.

Applicability:

This course is designed to be useful in the following engineering domains:

  • Fabrication of Boilers

  • Inspection of Boilers

  • Testing of Boilers

  • Pressure Vessels

  • Heat Exchanger

  • Columns

  • Tanks & Process Equipment's using relevant codes

Batches & Duration:

This course incorporates study of major international codes and standards such as ASME, API, TEMA and IBR. This course is recommended for candidates aspiring to make their careers with Engineering Consultants, Fabrication Companies, EPC Contractors, and Project Engineering Companies.

Applicability:

This course is designed to be useful in the following engineering domains:

  • Weekend Batch - 11 Months

  • Thursday Batch - 11 Months

Subjects

Following subjects will be covered as a part of the course:

  • Coded design of pressure vessels & design of storage tanks

  • Heat Exchanger design

  • Equipment design for unit operations

  • Fabrication of process equipments

  • Materials of construction & corrosion

  • Statutory regulations & safety code rules

  • Inspection and quality control of process equipments

  • System Engineering & detailed engineering